Overview
Project: Computing Infrastructure
Jiangxi Provincial Computing Center is a strategically significant supercomputing and digital foundation project in Jiangxi’s regional computing power layout. As the core carrier of the province’s high-performance computing, scientific research computing power, data storage and public digital services, this computing center relies on LANQEVA GLOBAL’s AC8000 micro-modular integrated solution to ensure the stable and reliable operation of supercomputing clusters, storage systems and computing power scheduling platforms.

Jiangxi Provincial Computing Center is an important computing infrastructure project in Jiangxi Province.
Project Requirements: Zero-Interruption Operation for the Supercomputing Computing Foundation
As the core computing power gateway for scientific research innovation, industrial simulation and big data services in the province, Jiangxi Provincial Computing Center operates 7×24 hours without interruption. High-specification supercomputing centers place extremely high requirements on power supply and environmental protection for computing clusters, storage networks, cluster management systems and supporting monitoring facilities. The project required an integrated micro-modular data center solution that provides stable online power supply protection, elastic capacity expansion, supporting precision temperature control and support for large-scale computing loads.
AC8000 Micro-Modular Data Center Solution
AC300 Intelligent Modular UPS Power Supply
- Highly reliable modular UPS
- Supports hot-swapping of modules and online capacity expansion
- High overall operating efficiency, adapted to the characteristics of computing loads
- Compatible with multiple battery solutions to meet long backup power requirements

MA100 Precision Air Conditioner for Large Computer Rooms
- Row-level high-density cooling solution
- Precise constant temperature and humidity, adapted to high-density server heat dissipation
- Intelligent speed regulation, reducing computer room PUE
- Adapted to closed cold aisle deployment, ensuring stable temperature control for computing equipment

This integrated micro-modular architecture provides outstanding flexibility for the supercomputing center in operation and maintenance management, later computing capacity expansion and energy consumption optimization, ensuring that power and temperature control infrastructure can continuously expand and iterate along with computing services. The project deployed three sets of AC8000 micro-modular data centers, each equipped with 25 cabinets, totaling 75 cabinets. The entire system has completed installation and commissioning and passed acceptance inspection smoothly.
Project Value: A Stable Computing Foundation Supporting Regional Digital Research
The deployment of the AC8000 micro-modular data center at Jiangxi Provincial Computing Center demonstrates LANQEVA GLOBAL’s capability to serve major provincial-level computing infrastructure projects. Integrating highly reliable modular UPS power supply, precision refrigeration, integrated cabinets and intelligent monitoring, the micro-modular solution provides a stable, efficient and scalable computing infrastructure foundation for high-performance computing, scientific research simulation and digital industry innovation in Jiangxi.
This project confirms the industry’s full trust in LANQEVA GLOBAL in key scenarios such as power supply continuity, elastic system expansion, long-term stable operation and maintenance, and green energy saving.